Build Madness

Chapter 82 Let's just look at the scenery (please recommend, please collect)

It is impossible for Ge Xiaotian to let Xiao Liu go.

At least, the person can leave, but the certificate stays!

There are many standards for construction companies to upgrade their qualifications.

In addition to the requirements for architectural achievements, there are also restrictions on technical titles and management experience.

The enterprise manager of the third-level construction company needs to have more than five years of project management experience.

The technical person in charge also needs to have more than five years of experience in construction technology management, and has an intermediate professional title.

Tian Cheng has just been established, although the strong men all have corresponding skill certificates after changing jobs, experience needs to be accumulated.

Therefore, when I first registered for qualifications, I spent a lot of money to hire people to be affiliated with.

It roughly means that people do not need to work, and the certificate is given to me, and the money will be paid as usual.

Ge Xiaotian wants Lao Qin's branch company, but it's not limited to machinery.

There are also a large group of elite technical talents who have gone through ups and downs and come from the gray age.

Just like Xiao Liu, with a college degree, 12 years of experience, and all kinds of certificates.

There was no construction engineer in 1999, so his role would be great, and he is a necessary talent for formal enterprises.

As for Lao Qin, he has no evidence at all, so what the hell is he doing!

Huh?

It seems that I don't have any certificates, I still have a junior high school diploma!

Otherwise, go to the whole self-examination?

First go to high school, then go to junior college, then go to college, and take the postgraduate entrance examination...

Three years, three years, two years, three years...

The kids know how to make soy sauce!

farewell!

…………

Back to the football field.

The friendly match is over and the award ceremony is being held.

but……

Where are the people from the elite team?

Li Hu was very proud, Leave early!

Why?

Except for serving the ball, they barely touched the football!

Huh? How many to how many?

2-0, didn't you say you only performed, but didn't shoot!

Damn, wouldn't that make people even more aggrieved? It's better to score crazy goals!

Let those cuju masters move bricks, and stop playing football!

Ge Xiaotian immediately decided that in the future, except for the ball games he played, he would not participate in other events.

The strong men are all in their thirties and forties, and they don't meet the standards of professional players at all.

In case any trouble is caused, Tian Cheng will also be implicated.

It's better to make a Sancha cup and play casually...

…………

Time flies, another night.

December 1st.

Teachers and students from the School of Civil Engineering came to exchange and study.

Departing from Jifu, I took the green leather train for a whole morning, and finally arrived in Xiangxian County.

Not many people, one professor and two students.

Regardless of how Tiancheng develops in Xiang County, it is still a small rural enterprise.

For a serious university in Jifu, being able to come is already a great deal of face.

Or maybe, the professor wanted to come out to relax, and it happened that a company reimbursed the travel expenses...

Professor Hu, hello! I am the general manager of Tiancheng Construction Company, Ge Xiaotian!

Hello, Mr. Ge!

Looking at the sunny, handsome, stylish, elegant, mature and charming young man in a suit, Hu Jun who walked off the big gold cup was like a spring breeze, his eyes flashed, he was very surprised, rich second generation?

Then, his eyes were attracted by the crescent-shaped building.

About thirty meters, not too high!

but……

Hu Jun raised his palm, gestured left, gestured right, then ran to the side and tilted his head to look carefully.

Fantastic design!

In another time and space, Ge Xiaotian had never seen any architect or experienced any scene, so he responded naturally, Why don't you go up and have a look?

good!

Several people put on the hard hats they had prepared long ago, and Ge Xiaotian took out the design drawings, construction drawings, structural drawings, and even translucent design sketches from the file package.

Time to perform real techniques!

Hu Jun stopped and went, going around, Flexible foundation? No! There is also an independent foundation?

Yes, because the load on the upper part of the crescent is relatively large, a part of high-strength materials that are resistant to tension and bending are used as a flexible foundation, and then double-fast cement anchors are used to connect the shared independent foundation prefabricated by reinforced concrete to form a special foundation. Joint foundations, or extended foundations, are complicated to construct, but save time!

Add two more cup-shaped foundations? The axes cross? Then according to the amount of reinforcement... What a strange construction method! Is there a raft underneath?

No, it's too time consuming!

The raft foundation is also called the full foundation, which is to make the entire foundation into a reinforced concrete structure.

In addition, it has a brother called box foundation.

This kind of foundation needs watering and maintenance, let alone a 15-day cycle!

Unless necessary, Ge Xiaotian generally would not choose.

In his thinking, no matter how complicated the construction is, as long as the time can be shortened by manpower and machinery, he will never use the time-consuming 'lazy' method.

After chatting a few more words, Hu Jun looked at Ge Xiaotian with a weird look.

Mr. Ge, how old is this year?

eighteen!

Let me take the liberty to ask, what degree do you have?

Oh, graduated from junior high school, all by self-study!

Hu Jun looked suspiciously at the crescent moon from the inside, and asked casually: Steel structure is used? So, besides welding, bolts, and rivets, what else?

Threads, clamps, grooves, key joints, splines, interference, elasticity, etc., or called hub connections. In fact, due to the characteristics of the steel itself, there are still many connection methods that have not been applied. If more research Studying ancient mechanism techniques, these connection methods can be understood, and even borrowed one or two. In addition, there are some ingenious connection methods circulated among the people, such as hot melting, cold rolling, butt welding...

After finishing speaking in one breath, looking back at the two confused students, Ge Xiaotian laughed wildly in his heart, finally able to pretend!

I'm suffocating!

Limited by steel production in 1999, steel structures have not been widely used in the construction industry.

Except for several connection methods mentioned in a book published a few years ago, the other methods are all limited to a certain area, and it’s not that there is no one, but no one organizes or spreads them!

Looking back, it seems that around the Olympic Games, steel structure was vigorously promoted and became a professional course.

Discussing the steel structure with me now, I think Comrade Ge Feng broke two belts in order to get a thorough understanding of this stuff...

In fact, to put it bluntly, steel structure technology represents the speed of infrastructure construction!

However……

He held his head up and waited for a long time, but Ge Xiaotian didn't hear the applause.

Looking down, Professor Hu is making the two students write and draw with a small notebook.

Huh? You are?

Oh, I'll make them write it down!

What?

On the application and development of steel structures in non-standard buildings! With your company's crescent moon landmark, I feel that I can open a special extended research course!

Huh?! It's a very familiar plot, but it doesn't matter if you write it down. Vocabulary does not represent technology. Besides, this technology is not his, but the common wisdom of folk laborers.

Just like the masters of the agricultural machinery station, they don't understand steel structures, but they have a unique connection method that they understand from the engine assembly, which is very stable and is often used in the Crescent Landmark.

Ge Xiaotian had never seen it in another time and space, so he learned it on the spot.

Mr. Ge, why don't we have a deeper chat?

which aspect?

Since you know so much about steel structures, you must have done a lot of research on steel!

Ah? I don't know much about steelmaking: Professor Hu, it's getting late, why don't we go to the company's residence?

Oh? Isn't this your company's residence?

This is just a development zone, and the company is located in Sancha Township!

Okay, let's talk in the car then!

Huh? How nice is the scenery?

It's already winter, how can there be any good-looking places...

Hey? Professor, look at the sky, that cloud is very beautiful, like a galloping horse...

Thanks to Night Breeze, I'm Looking Up at Heaven in Hell 1, Green Tree Shade, That Night's Style, Falling into the End of the World, 32**121, Book Friends 170**559, There Are Plane Trees at Home One, Brother eats quack, Poetry written, loli-controlled fake house, Elio, I am a foreigner next door, Dynasty Dominance, Judge of Hell, Feng Luo 96, Meng Shen G Gu Pity, Nan Friend i, Xiaoxiaoyu's Enemy Is Not Destroyed and others for their rewards, thank you for your recommendation tickets and collections.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like