The rise of nanometers

Chapter 203 Electricity Problem

Wang Shuo, who traveled from Weizhou Power Plant in Ning District to Dezhou Power Plant, got out of the car and washed his face. Seeing his thinning hair, he was very worried about whether he would still have hair on his head in a few years.

Patting his face and cheering up, he came to the conference room.

Lin Yicai, branch manager of Long Totem, Zhao Xiaojun, branch manager of Blue Era's Lu Province, and heads of other related companies were all in the conference room.

The purpose of this meeting is to ensure the stability of the power supply in Texas. Although the Suiren Department has many self-sustained generating units, and with the recent solar factory plan being built, the power can basically be maintained.

However, as Texas' industrial scale has increased and it has become the semiconductor core of the North, the core of China's solar energy industry, and one of the transfer stations for water transmission from east to west, electricity consumption is increasing day by day.

Last year, industrial electricity consumption in Texas was only 2.6 billion kilowatt-hours. However, in early June this year, in the first five months of the first half of the year alone, industrial electricity consumption reached 1.64 billion kilowatt-hours. It is expected that industrial electricity consumption throughout the year will reach 1.64 billion kilowatt-hours. Approaching 4 billion kilowatt hours.

Fortunately, Suiren relies on self-sustained generating units for a large part of its industrial electricity consumption. Otherwise, this electricity consumption would have to increase by at least 500 to 800 million kilowatt hours.

Even so, the huge power supply pressure still makes the power grid very troublesome, and the power grid puts the pressure on several power generation groups.

Wang Shuo appeased several heads of companies with relatively large electricity consumption:

"Don't worry, everyone. The three 350-megawatt gas turbine generator sets of Dezhou Power Plant arrived in Dezhou a week ago. Engineers from Beifeng Plant are installing and debugging them. They will be put into power generation next month."

"That's good. My glass production line cannot be stopped, otherwise the entire equipment will be useless."

"Old Zhao, please stop complaining. My monocrystalline silicon furnace is different. It's still a snail's glass factory with its own generator set."

"Haha, don't you envy me? A gas-fired generator set costs millions. Your monocrystalline silicon solar panel factory probably requires five or six sets to be enough."

"Unless you have gas of your own, you'd better give up!"

A group of bosses or people in charge started discussing.

Zhao Xiaojun looked at the second phase plan of the Dezhou Power Plant. After putting down the document, he communicated with Wang Shuo and the person in charge of the power grid in Dezhou.

Based on the current situation, Texas' comprehensive social electricity consumption will grow at an annual rate of 20 to 30% in the next five years.

By 2015, annual electricity consumption will reach 15 to 16 billion kilowatt hours, which is about three times the current annual electricity consumption in Texas.

Zhao Xiaojun reminded: "If we rely solely on the Dezhou power plant, it may be difficult to cope with future development."

Wang Shuo also had a wry smile on his face and scratched his thin hair: "The power of the Beifeng 2 gas turbine is 350 megawatts. If it is fully loaded all year round, it can generate 3 billion kilowatt hours."

But in fact, domestic thermal power station generating units usually have an annual operating time of about 5,000 to 5,500 hours.

This is because of the need for peak shaving and valley filling, as well as the power generation from power plants that can be connected to the Internet. It is not easy to get online. The pressure of the power grid and the power consumption level of surrounding areas must also be considered.

There are very few thermal power stations in China that can produce more than 6,000 hours of power annually.

The person in charge of the power grid said that the transmission lines in Dezhou and Shandong Province will be upgraded in the near future to increase the load capacity of the lines.

But Huang Ming has his own plans. The property rights of Huangming Group’s Sun Valley Industrial Park are expected to be clarified and delivered around August this year.

Huangming Group, which itself focuses on the solar energy industry, has a short-term goal to take over part of Long Totem's solar panel business and at the same time delve into the downstream of the solar industry.

Sun Valley Industrial Park is a very good starting point. For example, the concept of all-solar green life, eco-tourism, and three-dimensional agriculture are all good development ideas.

Huang Ming plans to gradually expand the scale of Sun Valley and include a nearby reservoir within the scope of the industrial park. Installing solar panels on the reservoir can just use the reservoir water area and reduce the evaporation of the reservoir water.

After everyone held the Dezhou Power Supply Meeting, Wang Shuo went directly to the Dezhou Power Plant. The three Beifeng 2 units were being installed and debugged at this time.

Also coming with him was Zhao Xiaojun, manager of the Blue Era's Lu Province branch.

"It seems that Beifeng Factory's technology has improved a lot."

Wang Shuo nodded: "The thermal efficiency of cycle combustion is about 55.7%. With the thermoelectric power generation module, the overall thermal efficiency has reached 66%."

The person in charge of the power grid on the side remained silent.

Zhao Xiaojun turned around: "Mr. Zhang, you can consider our company's proposal."

"Mr. Zhao, is it inappropriate to run a separate line?" Zhang Xingzhou sounded worried in his words.

"Mr. Zhang, you have also seen the electricity consumption of the east-to-west water transmission project. Now the water pipeline from Dongying to southern Hebei Province has been laid. There are also other lines, pressurization and water distribution stations that require electricity. The amount is so large that pulling a single power supply line is a helpless move.”

Faced with Zhao Xiaojun's request, Zhang Xingzhou couldn't agree to it for a while: "I will report this matter to the head office."

Regarding the attitude of the power grid, Zhao Xiaojun actually had some expectations. Sometimes when doing things, state-owned enterprises always try to avoid making mistakes rather than seeking merit.

Blue Era also has a second plan, which is to expand its own power supply capacity. Although power generation groups have no way to directly sell electricity to Blue Era, it is legal for companies to self-sustain power supply.

In fact, using electricity from the grid is a very helpless choice. In many cases, due to the need for peak shaving and valley filling, on the premise of ensuring residents' electricity use, industrial and agricultural electricity can only be sacrificed.

This is also the reason why Suiren Department vigorously developed a self-sustained power generation system from the beginning. The purpose is to reduce dependence on the power grid, and the other purpose is to reduce costs.

The Suiren system, which can produce its own gas, has many inherent advantages in its self-sustainable power generation strategy.

It's just that due to the rapid development of the Suiren system, branches in many places have no time to deploy self-sustained generating units and can only temporarily use the power supply from the grid.

However, in the face of the East-West Water Transmission Project, which transports tens of billions of cubic meters of water every year, if the power grid does not provide dedicated lines for the Blue Era, the problems may be very serious.

Electricity is one of the basic necessities of modern life, but water is an eternal necessity.

There will be more and more water transmission lines in operation and under construction, which will test the power supply capacity of the power grid.

It is better to ask for help than to ask for yourself. After Zhao Xiaojun inspected the Dezhou Power Plant, he wrote an email to President Li Feiyang, explaining the power supply pressure of the northern water transmission system and hoping that the head office would solve this problem as soon as possible.

After writing the feedback email, Zhao Xiaojun received an invitation from Xiao Yuan, the president of Fengmin Agriculture, and planned to go to Anyang City in Henan Province together.

Because the western end of the Dongying Line has been laid near Anyang City.

Fengmin agriculture, which developed rapidly in the North China Plain, also accelerated its expansion with the extension of water pipelines.

The recent development of Fengmin Agriculture in Anyang has been in such a state. Zhao Xiaojun, who received the invitation, looked at his schedule, adjusted several arrangements, and agreed to Xiao Yuan's invitation.

The staff of the two companies quickly made preparations to go to Anyang.

Thank you for your support (ω`).

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like