The rise of nanometers

Chapter 78 Tianshui Water Affairs

The integration work of United Water in Tianshui has been initially completed. The Economic Supervision Office, which is responsible for internal reform work, left the resident team and rushed to the next local water company.

The general manager of Tianshui Water Company was transferred from Chang'an headquarters just after an inspection.

In the reform work of United Water Affairs, a very important subsidiary condition is that the management of United Water Affairs will completely take off their official hats.

This restriction is actually to reduce the number of politician-style management. People working in United Water Services no longer have an institutional establishment, not even a business establishment, and are just pure corporate management.

This condition has also caused a large number of people to be very entangled.

Because joining United Water Affairs means that there will be very big restrictions in the future. They cannot be transferred to other state-owned enterprises or official institutions. They can only be regarded as managers.

In the very beginning of the cooperation, Huang Xiuyuan made it clear that the state-owned enterprise style was to completely cut off the disconnection.

If this is not done, the management of the water company will still have a business title, and they will often consider how to get promoted, how to maintain stability, and how to keep their positions.

The former head of Tianshui Water Company refused to join United Water Company for this reason and returned to work in the Water Conservancy Bureau.

Yang Zhiye, who took over Tianshui Water Affairs, was a former section chief of Chang'an Water Affairs and had been in the system for almost 20 years.

During this water affairs reform, because of his clean foundation, he was assigned to take charge of Tianshui Water Affairs and served as the general manager of Tianshui Water Affairs Company.

The former water supply office building was changed to the United Waterworks Tianshui Company after taking over related work.

In the general manager's office.

Yang Zhiye, the heads of the two water plants, heads of various departments, and Li Mingchu, the leader of the supervision team, are having a meeting.

"After the initial reform, everyone may not be comfortable with it, but let me make it clear first. If the company can make a profit, it will benefit everyone. If anyone still retains the small ideas from the past, Team Leader Li and I will not show mercy."

From the very beginning, Yang Zhiye gave everyone a start.

"Currently, the staff of Tianshui Water Affairs is still too bloated, so everyone must be mentally prepared."

Wu Hongbing, who was in charge of personnel, asked hesitantly: "Mr. Yang, do you know how many people will be laid off?"

"The total number of employees is 861, and according to the plan, the number will be reduced to about 400 in the next three years."

"What?"

"so much……"

"Isn't this not good?"

Yang Zhiye said in a calm tone: "The reduction of staff does not mean layoffs, but relocation to other companies. However, I have said something ugly before. I have clearly explained those small actions in the past to the people below. If they show up again, they will pack up and leave."

"clear."

"I will definitely give the order."

All the department heads and factory directors breathed a sigh of relief. As long as they weren't fired, it wasn't too serious.

Li Mingchu on the side has been silent, only taking notes of some conversations, because they will not interfere with specific operations unless there are serious problems with the management's decision-making.

Yang Zhiye pushed away the map of Tianshui and pointed to the Qinzhou District in the city and the Maiji District next door:

"Currently, Qinzhou Waterworks and Maiji Waterworks have obvious shortages of water supply. Water shortages occurred last summer. It is estimated that with the growth of population and industrial and agricultural production, Tianshui's water supply pressure will become increasingly huge in the future."

Han Zhonghua, director of Qinzhou Waterworks, nodded: "That's true. The infrastructure of the two old plants was built in the 1980s and 1990s. They are currently facing aging pipelines and insufficient water storage in the reservoir area."

Yang Zhiye then said:

"So we must be prepared. First, prepare to build a sewage treatment plant to treat wastewater and sewage so that the sewage can be recycled back to the reservoir."

"Second, start promoting sewage discharge contracting projects to various enterprises to help them achieve internal water recycling and reduce the proportion of industrial water."

"Third, after the internal circulation of sewage treatment plants and industrial water is completed, the water supply pipelines will be comprehensively upgraded to gradually and orderly reduce groundwater extraction."

"Fourth, establish strategic water storage reservoirs and build covering layers for strategic reservoirs to reduce the evaporation of stored water and the pollution caused by sandstorms."

These tasks will be carried out step by step. Yang Zhiye has calculated some situations of Tianshui water affairs. Last year, Tianshui's total water supply was 36 million cubic meters. For a region with a total population of 3.45 million, the per capita water supply was only 11 cubic meters per year.

If we subtract industrial and agricultural water use, it is estimated that the annual per capita water supply is about 6 to 7 cubic meters.

While the per capita per capita in the South is several hundred cubic meters per year, the per capita per capita in northwest cities is not even a fraction.

It’s not that people don’t want to use it, nor that they can’t afford it, but that there is no way to supply local water resources.

If calculated based on the per capita potential of 100 cubic meters per year, Tianshui's water supply consumption potential is at least 345 million cubic meters.

According to the current price, calculated at 2.6 yuan per cubic meter of water, annual sales can reach about 900 million yuan. Including industrial, agricultural and commercial charges, the annual revenue is 1.2 billion, which is very conservative.

Therefore, it is very necessary to promote the internal circulation of sewage treatment plants and industrial water.

Yang Zhiye arranged various tasks and began to prepare to find a place to build a sewage treatment plant and a strategic reserve reservoir. At the same time, he prepared to cooperate with Blue Era and hand over the filtered pollutants to Blue Era for treatment.

January 18th.

Tianshui, Qinzhou Waterworks.

Yang Zhiye and Han Zhonghua checked the situation of the water plant. The newly renovated tap water purification equipment and trace element addition equipment are in trial operation.

Qinzhou Water Plant is a subsidiary of United Water Affairs. It is one of the first water plants to undergo water purification renovation. There are only three quotas in total, and they are all used in cities with worrying water quality.

Yang Zhiye looked at the water purification situation: "Zhonghua, you have to do a good job. The sewage treatment plant will not be completed for a while. It will not be put into use until at least the second half of this year."

"I will cooperate with the company."

Since the sewage treatment plant is still under planning and construction, the water company has chosen a stopgap measure, which is to connect nearby sewage pipes to the water plant's reserve pool and process the sewage through water purification equipment.

The treated sewage is injected into the reservoir to increase the water storage capacity of the reservoir.

There are also plans to carry out preliminary improvements to the sewage systems in nearby towns and villages to transport sewage to water plants.

According to calculations, if the plan goes well, Qinzhou Water Plant can process 30,000 to 80,000 cubic meters of sewage every day. This treated pure water will greatly supplement the water supply gap.

Before the renovation, the daily water supply capacity of Qinzhou Waterworks was about 50,000 to 60,000 cubic meters.

After the transformation, the daily water supply can be increased to 80,000 to 90,000 tons, and the surplus pure water will be used as preliminary reserve water and injected into the reservoir.

After inspecting the Qinzhou Water Plant, he also went to the Maiji Water Plant without stopping. There is currently only one small water purification equipment here, which can only process 20,000 cubic meters per day.

Even a water purification device can greatly improve water quality.

The purified water is mixed with the original tap water to neutralize the quality of the tap water, significantly improving the water quality.

Halfway through Yang Zhiye's inspection, his cell phone suddenly rang.

"Hello!"

"Mr. Yang, there is something wrong with the No. 8 pipe in the city. It may be cracked by the frost."

"Immediately organize emergency repairs. I will be there soon. I will also send a text message to inform you that the line is being repaired and the water supply may need to be shut down for a day."

"clear."

Thank you for your support, and thank you book friend "Yang Shungang" for the reward (ω`)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like